Large Residential Community

PARKING LOT

MATTHEWS, NC

ISSUE

Large community requested a new 218 space parking lot for staff which required extension of a roadway, utilities, and sidewalk.  The parking lot and roadway extension were in areas of poor subgrade soils and shallow groundwater.

SOLUTION

  • Clearing and preparation of over 5 acres

  • Installation and maintenance of all erosion control including inspection services.

  • Export of over 40,000 yd³ of unsuitable materials.

  • 400 tons of Portland subgrade stabilization.

  • Import of over 15,000 tons of aggregates for subgrade preparation.

  • Nearly 1,000 LF of new stormwater pipelines and associated structures.

  • 500 LF of new waterline with valves and hydrant.

  • Installation of over 1,800 LF of new curb

  • Installation of over 1,600 LF of new sidewalk.

  • Over 8,000 yd² of asphalt paving including striping and signs.

  • New LED street lighting package.

RESULTS

The project required multiple trades and very tight logistics.  It was successful considering completion 2-weeks ahead of our deadline.

CONTACT US

Fill out the form below to get in contact with Eric and learn more about solutions for your project.

Logo White

CONTACT US

Tel: (980) 721-2841

PO Box 548 Indian Trail, NC 28079

2024 Heric Solutions | Website by Candor Creative Company

bottom of page