top of page
Independent Living Community
TRAIL CONSTRUCTION
MATTHEWS, NC
ISSUE
Existing independent living community sought to utilize existing “unbuildable” land to create a recreational trail.
SOLUTION
-
Heric managed and executed the:
-
Grading and preparation of nearly ½ mile of trail area.
-
Stone subbase and asphalt paving.
-
Wooden observation deck adjacent to a pond.
RESULTS
The project required strategic planning in order for trucks and equipment to access through wetland areas.
The project was a success as the trail is used for resident physical therapy and overall wellness. In addition, a grand opening ceremony was held with Town of Matthews Mayor in attendance.
A future extension is in design!
bottom of page


