top of page

Independent Living Community

TRAIL CONSTRUCTION

MATTHEWS, NC

ISSUE

Existing independent living community sought to utilize existing “unbuildable” land to create a recreational trail.

SOLUTION

  • Heric managed and executed the:

  • Grading and preparation of nearly ½ mile of trail area.

  • Stone subbase and asphalt paving.

  • Wooden observation deck adjacent to a pond.

RESULTS

The project required strategic planning in order for trucks and equipment to access through wetland areas. 

The project was a success as the trail is used for resident physical therapy and overall wellness.  In addition, a grand opening ceremony was held with Town of Matthews Mayor in attendance.

A future extension is in design!

CONTACT US

Fill out the form below to get in contact with Eric and learn more about solutions for your project.

Logo White

CONTACT US

Tel: (980) 721-2841

PO Box 548 Indian Trail, NC 28079

2024 Heric Solutions | Website by Candor Creative Company

bottom of page